• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Barba + Wheelock Architects

Barba + Wheelock Architects

Architects

  • Who We Are
    • About the Firm
    • Our Team
  • What We Do
    • What We Do
    • Our Approach
  • What We’ve Done
  • Awards & Press
    • Awards
    • In the News
  • Contact
- Maine Educational Center For The Deaf And Hard Of Hearing

New Construction

Maine Educational Center For The Deaf And Hard Of Hearing

Contextual DesignMaster PlanningNew Construction

October 26, 2022 by

Barba + Wheelock was engaged to develop a master plan for the campus, including implementing the first new building on the campus in 50 years. B+W was asked to review options for renovation of an existing building compared with new construction. In the end, the conclusion was to build new, as the existing circa 1950s buildings would require extensive and cost-prohibitive renovation to adapt the classrooms for deaf learning and visual learners.

The Maine Educational Center for the Deaf and Hard of Hearing campus was developed in the mid-1950s as a collection of brick buildings with connecting walkways surrounding Governor Baxter’s Mackworth Island summer estate. The new building serves the entire school population from K-8 and provides space for infant-pre-kindergarten programs and deaf education research professionals. The campus library was relocated to this new facility.

The project team was involved from programming and design through construction. Our team was successful in securing a $91,000 grant from the Public Utilities Commission (PUC) toward the installation of energy efficient features. From the outset, B+W committed to designing a high-performance school, and midway through the design process, the Director of BGS pushed for this project to be the first state-owned school to achieve a LEED (Silver) Certification. The new building, the first all-new structure on the campus since the 1950s, is a demonstration of the commitment to sustainable design on the campus moving forward.

The design achieved both B+W and the State’s environmental objectives, and nestled the new building into the campus, connected with the original covered walkways. Its form and materials blend well within the existing context.

Paying special attention to compensatory senses also characterizes schools for special-needs students. At Brewster Hall, a new K-8 building at the Governor Baxter School for the Deaf in Falmouth, Maine… Barba + Wheelock deftly balanced daylighting and lamp illumination. The resulting system of light shelves and roof monitors allows daylight into deep interior spaces like the library and minimizes glare in order to facilitate hearing-impaired students’ reliance on visual information.
-Architectural Record, “Schools for the 21st Century”

Silver LEED Certification

- Maine Educational Center For The Deaf And Hard Of Hearing
Contextual DesignMaster PlanningNew Construction

Fairview Cemetery

Contextual DesignMaster PlanningNew Construction

October 28, 2022 by

Fairview Cemetery was established in the 1920’s with traditional below-ground burial plots, and a Christian chapel built of stone. The chapel had fallen into disuse and maintenance buildings took inappropriate spaces on the lawn. Furthermore, the cemetery had very little space remaining for traditional burials.  The new Fairview Cemetery needed to be suitable for more activities; to include the changing demographic in West Hartford of varying religions and ethnic groups; and to make efficient use of the existing space. This was especially crucial given the high cost of acquiring more land.

The master plan for this phased project includes 10 new mausoleums with 2,000 crypts and niches for cremation urns, a memorial garden for ash burial, and a new appropriately-sited maintenance building. An oval central space – a town common – suitable for a variety of public activities, organizes the new cemetery design. This space is bordered by a retaining wall with niches for cremation urns. Pergolas define sacred spaces next to the larger open central space. The crypt buildings face away from the central area; spaces between and around the crypt buildings form intimate courtyards. The central space and cemetery entrance are further defined and softened by a small pool.

The materials and form of the crypt buildings convey warmth and human scale. An assembly of crypt modules, five wide and five high, retain a human-sized scale. Gabled roofs give house-like shelter. Warm, substantial stone walls refer harmoniously to the existing chapel.

The Fairview Cemetery received the 1995 Maine AIA Award for Excellence, and the 1998 AIA Connecticut Design Award.
The project was also featured in an NPR radio story with Nancy Barba and Peter Chow, authored by Margo Adler.
- Fairview Cemetery
Contextual DesignMaster PlanningNew Construction

Zausner Residence

Contextual DesignNew Construction

October 21, 2022 by

Elegant formal living spaces predominate, book-ended by a rugged dayroom on one end, which serves as guestroom and for casual entertaining, and an English conservatory dining room on the other.

Second floor bedrooms and baths feature other skylight dormers, and the master bath triumphs with a full glass shower windowed to the view.

The kitchen, open to the formal living spaces is equally formal, yet functional. Classic proportions and details highlight rooms unified by the old-growth recycled pine floors.

There is an enduring sense of pleasure and accomplishment each time I stay at the vacation home that Cynthia Wheelock and Nancy Barba designed for me. From its conception through the closeout of the punch list they brought a level of excellence and commitment and imagination to the project that achieved a result beyond my dearest expectations.

They had imagination – volumes, vibrant exteriors that integrated with highly functioning interiors and a strategic sense of site planning, as well as materials, exterior and interior finish and the many points of design and livability that most clients are not experienced enough to do well with.

In the design process they were discoverers: non-ideological, receptive and iterative, pushing themselves and their clients to explore a range of ideas and alternatives.

Their detailed due diligence led to selecting an excellent builder and an unexpectedly smooth construction phase. There was almost faultless conformance to a highly detailed set of construction documents and shop drawings. The craftsmanship realized the highest ambitions of the plans.

– Freeman Zausner

- Zausner Residence
Contextual DesignNew Construction
  • « Go to Previous Page
  • Page 1
  • Page 2

Footer

  • Instagram
  • Facebook

Copyright © 2025 · Barba + Wheelock • site by iKnow Web Design